cropped-PermaZyme-newly.png

Permazyme Nigeria

Soil Stabilization Solution for Unpaved and Paved Roads in Nigeria

  • Perma-Zyme Bio-Compactor
  • View Application
  • Profile & Process
    • Frequently Asked Questions
    • Projects
  • Services
    • Paved Road Construction
    • UnPaved Road Construction
  • Contact
+2348123446577

make a call

The Application

1.PermaZyme is an innovative system of improving secondary roads We utilize organic and eco friendly enzymes to achieve results typically achievable with conventional construction methods. 2.Its an alternative method of constructing secondary roads or large parking areas It starts with the analysis of the soil either in-situ or the import if needed to be able to know how to incorporate the enzymatic solution with  the material to meet the design strength required by the traffic using the surface
  1. It’s a  completely innovative approach to roads construction
We create less of a subgrade and sub base on top of which we can put a thinner wearing course so that the overall profile of an unpaved road can be put at 150mm/200mm from 2x that depending on the traffic.
  1. We go out to help governments and communities that are trying to manage the already scarce resources for the managing and upgrading of roadway network especially in economies like ours that have infrastructural deficiencies to develop paved roads with asphalt- it’s an economical solution for States and Local Governments.
  2. PermaZyme can be used in a variety of installations in unpaved rural roads to different kinds of infrastructure roads.
  3. It’s a cold process which can be carried out anywhere the soil has a P.I of 15% upwards using g the most basic equipment
  4. It removes the need to a huge extent having to import aggregate materials over long distances in order to build the infrastructure road or paved road that is intended and also importing asphalt or asphalt related products to build the roads. We do this by utilizing the locally available or in-situ  materials working with everything on site.
From a value standpoint you may be able to utilize PermaZyme and improve 5km of road fir the cost of improving 1 km with asphalt. We have training videos opportunities available that covers the entire PermaZyme Bio-compactor application process from planning and preparation to application. Simplified for the contractors use as a guide coupled with our technical support both virtual and physical.
Share
Client
Satellite Towns Development
Release Date
January 21, 2023
Launch Project

Next Portfolio

Unpaved Road Construction

Related Projects/Works

WhatsApp Image 2023-04-14 at 8.03.05 AM

Unpaved Road Construction

by permazymenigeria
Paved roads asphalt

Paved Road Construction

by permazymenigeria
Site inspection by officials of the Lagos State Ministry of Works and Infrastructure
Site inspection by officials of the Lagos State Ministry of Works and Infrastructure-1
WhatsApp Image 2023-04-14 at 10.22.09 AM
Paved roads asphalt
WhatsApp Image 2023-04-14 at 8.03.05 AM
Completed Portions of the Wagbare Pilot Project Ikorodu Lagos State
cropped-PermaZyme-newly.png

Permazyme Nigeria

Soil Stabilization Solution for Unpaved and Paved Roads in Nigeria

  • Abiodun Cl, Opebi 101233, Ikeja, Lagos
  • +2348123446577
  • Extra links
  • About
  • News
  • Contact
  • Services
  • Projects
  • FAQ
  • Application
  • Open Hours
  • Mon – Sat: 8 am – 5 pm,
  • Sunday: CLOSED
  • Newsletter

Send us a newsletter to get update


    © 2025 Permazyme Nigeria. All rights reserved.
    Shopping Basket