cropped-PermaZyme-newly.png

Permazyme Nigeria

Soil Stabilization Solution for Unpaved and Paved Roads in Nigeria

  • Perma-Zyme Bio-Compactor
  • View Application
  • Profile & Process
    • Frequently Asked Questions
    • Projects
  • Services
    • Paved Road Construction
    • UnPaved Road Construction
  • Contact
+2348123446577

make a call

UPaved Road Construction

Perma-Zyme is used worldwide to stabilize the soil for unpaved road construction to create a long-lasting rock solid surface that will last over 10 years. When using Perma-Zyme, you can rest assured that your dirt road will be strong enough for all traffic and climates, including rain and snow, with little to no maintenance. Perma-Zyme is an environmentally friendly solution, so you can rest assured that you save time, money, and peace of mind.

EASY TO USE

Perma-Zyme is known for its unique ability to harden clay particles in the soil, creating a concrete-like surface. One of the best qualities that this solution carries is that it is extremely easy to use and requires only standard road construction equipment, such as a grader, water truck, drum roller, and a sheepsfoot roller. Dirt roads treated with Perma-Zyme often last in excess of 10 years with very little to no maintenance, saving you time and money that traditional construction methods do not offer.
Share
Client
Redeemed Christian Church of God
Release Date
August 15, 2022
Launch Project

Previous Portfolio

The Application

Next Portfolio

Paved Road Construction

Related Projects/Works

Site inspection by officials of the Lagos State Ministry of Works and Infrastructure-1

The Application

by permazymenigeria
Paved roads asphalt

Paved Road Construction

by permazymenigeria
Site inspection by officials of the Lagos State Ministry of Works and Infrastructure
Site inspection by officials of the Lagos State Ministry of Works and Infrastructure-1
WhatsApp Image 2023-04-14 at 10.22.09 AM
Paved roads asphalt
WhatsApp Image 2023-04-14 at 8.03.05 AM
Completed Portions of the Wagbare Pilot Project Ikorodu Lagos State
cropped-PermaZyme-newly.png

Permazyme Nigeria

Soil Stabilization Solution for Unpaved and Paved Roads in Nigeria

  • Abiodun Cl, Opebi 101233, Ikeja, Lagos
  • +2348123446577
  • Extra links
  • About
  • News
  • Contact
  • Services
  • Projects
  • FAQ
  • Application
  • Open Hours
  • Mon – Sat: 8 am – 5 pm,
  • Sunday: CLOSED
  • Newsletter

Send us a newsletter to get update


    © 2025 Permazyme Nigeria. All rights reserved.
    Shopping Basket